The details of the some of the consultancy projects are as below:
·
Project Report for Sri Ramadevara Katte Mini Hydel Project (2x750
kW) - (1995)
A project for preparation of the Detailed Report for Sri
Ramadevara Katte Mini Hydel Project (2x750 kW) was assigned to Central Board of
Irrigation and Power by Karnataka Power Corporation Ltd. during the year 1995
• Monitoring of Pilot
project for energy conservation -
installation of LT Switched capacitor banks in AP
(Engineering Stall College of India, Hyderabad) - (1994 to 1999)
This Project work awarded by REC to CBIP in 1994 was completed
in 1999.
•
Rajasthan State Electricity Board requested CBIP for the consultancy assistance
for arranging expeditious completion of their erection works of 33 kV Switchgear
and other works at Parwan Lift Irrigation Scheme at Baran near Kota. - (1998)
The Rajasthan State Electricity Board project's implementation
had commenced quite a few years ago before it was referred to CBIP. There were delays
for want of integration of various design and contractual
obligations. The CBIP took up the project in hand and arranged for completion
of balance work. The project of Parwan Lift Irrigation Scheme, District Baran, Kota
was inaugurated successfully on September 11, 1998 by the Hon'ble Irrigation
Minister, Rajasthan, Shri V.P. Singh Badnaur.
•
SACFA Clearances
for Tamil Nadu Electricity Board SCADA Project - (1999)
This project was commenced in the year 1999 with an envisaged
cost of Rs.15,90,000/- and completed in 2000.
•
Andhra Pradesh
Energy Efficiency Project - Hyderabad Urban SCADA Project, SACFA Clearances - (2000)
This
project of SACFA clearances for the SCADA Project was commenced in the year 1999
with an envisaged cost of Rs. 16.00 lakhs and completed in 2000.
•
Project title;
Study for Establishment of Model Distribution Management System in Nehru PlaceDistrict
of Delhi Vidyut Board: - (2001)
This project is for studying the existing sub-transmission
and distribution system in the Nehru Place District of Delhi Vidyut Board and consisted
of the following main activities:
Ø
Implementation of energy revenue monitoring
system and customer interface
Ø
Implementation of technical loss evaluation
and proposals for revamping the system
Ø
Remote monitoring on trial basis including
communication
Ø
Sample survey and analysis
Ø
Data processing/simulation studies and analysis
of results
This project was awarded by DVB to CBIP in June 2001 and
scheduled to be completed within nine months period. The funding for the same was
through Power Finance Corporation. The total cost of the project was Rs.87.00 lakh.
•
Prototype
Inspection and testing of double circuit 132 kV towers - (July to August 2002)
Western Power Corporation (WPC), Australia requested Central
Board of Irrigation & Power for the Consultancy assistance for Prototype inspection
of tower/Leg Extensions and Testing of four different type of towers for 132 kV
D/C Pinjar - Eneabba Transmission Line at Kalpataru Power Transmission Ltd., Gandhinagar.
The Project's implementation was taken up in July - August 2002. The
works consisted of:
Ø
Study of Standards of
the Country for tower testing, Purchaser's specifications in respect of Tower
testing requirements, Structural drawings of the concerned tower submitted by the
supplier in connection with prototype inspection, Loading diagrams, rigging diagrams
etc.
Ø
Pre-test checking of
the Prototype tower assembly, report of the material and bolts/nuts used in tower,
rigging arrangement and location of load cells at the test bed and calibration of
all the load cells used for the tower test.
Ø
Guiding and witnessing
the tests on the Prototype tower and preparation of test report.
The Western Power Corporation, Australia requested Central
Board of Irrigation and Power to act as witness during testing of tower. In doing
so, it had extensively utilized the services of retired eminent experts from the
relevant disciplines from the state of Uttar Pradesh.
•
Identification of Techno-economically Attractive
Hydro Projects in Uttaranchal
Central Board of Irrigation and Power was awarded the
consultancy work by M/s.Tata power Company for identification of 7 or 8 techno-economically
attractive Hydro Projects of Uttaranchal Pradesh and other good Hydro Schemes having
an installed capacity of about 100-150 MW and above. This project was successfully
completed within stipulated time of 3 months (March 2006 - June 2006) at a cost
of Rs. 2.50 lakhs and the report of the project covering salient features of the
identified project(s) such as type of scheme, location and approach, installed capacity,
head and brief of water conductor system etc. including location map and photographs
of the project components collected by the CBIP team who visited a few projects
to firm up the project features, was handed over to Tata Power Company.
• Creation of All India
Computerized data base of Power Sector Specialists - (2006)
Central Power Research Institute, Bangalore allotted a
project titled, "Creation of All India Computerized data base of Power Sector
Specialists" with an envisaged cost of Rs.4.00 lakh for a period 6 months from
December 2006 onwards. The project involved creating a data bank of Power Sector
Specialists, in the area of Planning/Designs/ Manufacturing/Execution /Maintenance
and R&M/R&D/ Contracts/ Operation/Non Conventional/Nuclear/ Hydro {Turbine/Generator}
/ Thermal {Turbine/Generator}/Transmission/ Distribution/Material Science &
Insulation.
• Documentation of Results & Benefits of research carried
out under MOP sponsored Research Schemes on Power (RSOP) from 1961 to 1998 by CBIP
- (2012)
Central Power Research Institute (CPRI), Bangalore assigned
a research project to Central Board of Irrigation and Power for compilation of the
Results & Benefits of the research carried out under Ministry of Power sponsored
Research Schemes on Power (RSOP) from 1961 to 1998 by CBIP with a envisaged cost
of Rs. 5.00 lakhs and duration of six months.
The objective of this project was to facilitate compilation
of the research reports of CBIP in the country and abroad at one point for benefit
of the professionals, organizations and other stake holders etc for accelerated
development of power sector particularly in their respective fields. The following
was the Scope of the project;
Ø
Collection of old reports/data from CBIP.
Ø
Scanning / Typing of reports available with
CBIP (130 nos.)
Ø
Development of software for easy access
and search etc.
Ø
Uploading on website.
Ø
Promotion of sale/circulation of the data
of research reports.
385 projects under RSOP on the subject areas such as hydro,
thermal, transmission, distribution and Protection & General etc were coordinated
and monitored by Central Board of Irrigation & Power during the period 1961-62
to 1998-99. Out of 385 projects, 130 reports relating to important projects have
been published.
•
Creation of Data
Bank of Power Sector Specialists in the country and Proper New Software Package
for easy access & search - (2012)
Availability
of profile of experts in various fields of power sector at one place is of great
help to share best practices in all areas of power sector, to provide broad based
expertise and provide a solid network for interaction with industry for technological
development. It would facilitate rendering consultancy services in different areas
of power sector using the proposed data base for utilizing the services of power
sector specialists. It would
also help in meeting the future power growth requirement. In view of
this Central Power Research Institute, Bangalore assigned this project titled, 'Creation
of Data Bank of Power Sector Specialists in the country and Proper New Software
Package for easy access & search' to CBIP to create a data base of power
sector specialists in various categories in a systematic and structured manner with
an envisaged cost of Rs. 6.00 lakh in February 2012.
The aim of the project was:
Ø
To develop the category wise database of
experts in the power sector in India.
Ø
To develop new Software package for easy
access and search of power sector experts with features like secure log in facility,
secure log out facility, intelligent search etc.
Ø
To regularly update the database of experts
as per assignment of the job to CBIP from time to time.
•
Indraprastha Power
Generation Co. Ltd. / Pragati Power Co. Ltd. - (2010)- Setting up of Solar Power
plant(s) at various sites for Indraprastha Power Generation Co. Ltd. / Pragati Power
Co. Ltd.
CBIP has successfully completed the consultancy project
of setting up of Solar Power plant(s) at various
sites of IPGCL/PPCL, which include Preparation of PFR & DPR, tender
documentation including technical specification; BOQ; cost estimate, project implementation;
monitoring etc. for solar power generation system.
•
PTC Energy-(2011)-
Conducting due Diligence Study of 500 KW Hydro-Kinetic Energy Project on UBDC at
Madhopur, Punjab on behalf of PTC Energy Ltd.
CBIP has successfully completed the consultancy project
of conducting due Diligence Study on behalf of PTC Energy Ltd. with following scope
of work
Part A
Ø
Study of water
availability round the year (in view of assumed PLF of 90%)
v
Reliable data for quantum of water (for adequate height proposed
for suspension of machines)
v
Whether the water
availability would be sufficient to achieve the claimed PLF of 90%
v
Velocity (Variations)
v
Authorization for use of canal water
v
Reliability of the past data available and
collection of latest data
Ø
To study the design
details of the canal including slope, lining etc at the proposed site.
Ø
Site visit to assess the field conditions.
Ø
Confirmation about suitability of site.
Ø
Details of permissions required for development of this project
from different agencies like Punjab Irrigation Department etc.
Ø
Whether this project would affect other
irrigation and downstream power projects of the state.
Part B
Ø
Technical Due Diligence of the proposed
Hydrokinetic Power Plant including equipments to be used on technical parameters,
efficiency, suitability, alternative option etc.
Ø Whether
such technology requires patenting/license/certification & operational reliability
of the proposed technology.
Part C
Ø
Study of Capital Cost. Reasonability of
the cost. If any such technology already exists in the market and its costing
Part D
Ø
To assess the technical and commercial viability
of establishing a factory for manufacturing the Hydro
Kinetic Units. Ø To
assess whether PEL investing into the manufacturing facility would be a viable option.
•
Tenughat Vidyut
Nigam Ltd. (TVNL) - (Oct. 2011 to May 2012)- Recruitment of Executives on Turnkey
basis for Tenughat Vidyut Nigam Ltd conducted from October 2011 to May 2012.
CBIP has completed the job of recruitment of executives
for Tenughat Vidyut Nigam Ltd., a public sector undertaking of Jharkhand state Govt.,
in 11 disciplines on turnkey basis. The job involved releasing of advertisement
in the newspaper, designing, testing & commissioning of customized software
for inviting online applications, screening of the applications as per the various
eligibility criteria, setting & printing of the questionnaires and OMR sheets,
conducting of written test at various centers, issuing of online admit cards to
the candidates, evaluation of the OMR sheets, preparation of result post wise/category
wise merit of all the candidates, conducting of interviews and forwarding the final
select list to the TVNL.
In total no. of 4141 online applications were received
and the job has been completed by CBIP successfully within the time frame.
•
National Power
Training Institute (NPTI) - (2011 to 2012)- Setting up of Questionnaire and Conduction
of Post Graduate Diploma Course (CET) Exam on behalf on National Power Training
Institute (NPTI) conducted during year 2011 and year 2012.
CBIP has successfully completed the job of conducting
Post Graduate Diploma Course (the most prestigious course of NPTI) Common Entrance
Test (CET)-2011 Exam on behalf of NPTI which included designing of questionnaire
and conducting of exam of more than 8000 graduate engineers of various disciplines
at 14 centers.
CBIP has also completed the job of conducting the CET-2012
with same scope of work as above where more than 8000 graduate engineers of various
disciplines had attended the written test at 14 centers.
•
Solar Energy Corporation of India (SECI) - (2013)-
Conducting written test on behalf of Solar Energy Corporation of India (SECI) for
the post of Sr. Engineer
CBIP has already successfully completed the job of conducting
written test on behalf of Solar Energy Corporation of India (SECI) for the post
of Sr. Engineer which includes the screening of the applications, database management,
designing of admit card and conducting of exam and evaluation of the OMR sheet.
More than 3500 Engineers had applied for the test.
•
National Hydro Power Corporation (NHPC) - (2013)-
Conducting departmental examination for National Hydro Power Corporation (NHPC)
Supervisor's
Recently CBIP has successfully completed the job of conducting
departmental examination for National Hydro Power Corporation (NHPC) Supervisors
which includes designing, printing & evaluation of OMR Sheet, designing of questionnaire
and conducting of exam.
·
Power System Operation Corporation Limited (POSOCO) - (2013)- Disbursement
of Scholarships to SC/ST/OBC Students (Boys & Girls) under POSOCO Scholarship
Programme
Recently CBIP has successfully completed the job of disbursement
of scholarship to SC/ST/OBC students (Boys &
Girls) who have passed the class X during 2012 on behalf of POSOCO.
•
Bihar
State Hydro Electric Corporation (BSHEC), Patna - (in Progress)- Main Power Planning/
Finalization of Manual personal and Finance Manual for Bihar State Hydro
Electric Corporation, Patna - currently in progress.
CBIP has been awarded the job of
finalization of manpower planning, personal Manual, accounting Manual
along with the delegations of power for Bihar State Hydro Electric Corporation,
Patna. These projects are currently in progress.
·
Performance Assessment on Participatory
Restoration and Management of Irrigation systems in Madhya Pradesh (2007)
India-Canadian environment facility New Delhi entrusted
CBIP the job of carrying out Performance Assessment on Participatory Restoration
and Management of Irrigation Systems in Madhya Pradesh. The performance assessment
was to be carried out for one major, two medium and three minor irrigation projects
of the state, which has been successfully completed.
|